THE LEWIS AND CLARK BRIDGE OPENING


A LOOK BACK ON THE PROJECT


EAST END CROSSING AERIAL FOOTAGE DECEMBER 2016


EAST END CROSSING ENVISION® PLATINUM SUSTAINABILITY AWARD


EAST END BRIDGE TIME LAPSE


DRUMANARD ESTATE – FOR SALE


THE ROSEWELL – FOR SALE


EAST END OVERVIEW


EAST END TUNNEL


EAST END BRIDGE


ROSEWELL ESTATE


EAST END CROSSING AERIAL TOUR (DECEMBER 2015)


EAST END TUNNEL UPDATE (DECEMBER 2015)


EAST END BRIDGE CONSTRUCTION (JULY 2015)


THE TUNNEL (JULY 2015)


INDIANA APPROACH (JULY 2015)


KENTUCKY APPROACH (JULY 2015)


ROUNDABOUTS OPEN HOUSE VIDEO


EAST END TUNNEL CONSTRUCTION


EAST END TUNNEL CONSTRUCTION


 

EAST END TUNNEL CONSTRUCTION AND DRIVE THRU


LOUISVILLE-SOUTHERN INDIANA BRIDGES – EAST END BRIDGE ANIMATION


 

LOUISVILLE-SOUTHERN INDIANA BRIDGES – CONSTRUCTION ACTIVITY ON THE OHIO RIVER


LOUISVILLE-SOUTHERN INDIANA BRIDGES – INDIANA CONSTRUCTION WORK BETWEEN RIVER AND SR 62 AND SR 265 INTERCHANGE


LOUISVILLE-SOUTHERN INDIANA BRIDGES – HARRODS CREEK AT RIVER ROAD, FUTURE SITE OF TUNNEL’S NORTH PORTAL


LOUISVILLE-SOUTHERN INDIANA BRIDGES – BLASTING, EXCAVATION ACTIVITIES FOR EAST END CROSSING


LOUISVILLE-SOUTHERN INDIANA BRIDGES – BLASTING, EXCAVATION ACTIVITIES AT TUNNEL’S SOUTH PORTAL, U.S. 42 AND KY 841