General
- 8.5 miles – total length of the new East End Crossing when all work is complete
- 1,200 – number of workers, including East End Crossing Partners employees and subcontractors, involved in the East End Crossing project
Kentucky
- 3.5 miles – total length of the Kentucky portion of the overall project
- 26,160 cubic yards – concrete for the tunnel
- 196,00 cubic yards – rock and dirt excavated for the tunnel
- 1,962,000 cubic yards – roadway excavation
- 180,000 square yards – concrete pavement for the roadways
- 2,000 feet – length of the approach bridge just north of River Road in Kentucky
- 1,200 feet – length of the Harrods Creek Bridge
- 340,000 square feet – noise and retaining walls
River
- 2,500 feet – total length of the main span across the Ohio River
- 300 feet – height of each of the two main towers
- 104 – stay cables on the main span of the East End Crossing
- 1,000 tons – weight of stay cables
- 4,960 tons – weight of rebar used on the main span of the bridge
- 24,000 cubic yards – amount of structural concrete
- 6,670 tons – weight of deck structural steel
Indiana
- 4.5 miles – total length of the Indiana portion of the overall project
- 14 – bridges and overpasses between Upper River Road in Indiana and the SR 62 and SR 265 interchange
- 13,340 cubic yards – concrete for all of the bridges and overpasses in Indiana
- 49,600 tons – weight of asphalt for the roadways
- 1,600,000 cubic yards – roadway excavation (30% rock)
- 39,800 square feet – retaining walls