Traffic Updates

 

Filter Traffic Updates by Category

September 21st, 2021, Pavement Maintenance

September 21, 2021 - September 22, 2021

Crews will be closing the left lane of SR 265 from Mile Marker 10.7 to 9.7 between 11:00 am and 3:00 pm on Tuesday September 21st. Please slow down and move over for road work for the safety of everyone.




September 23, 2021, Bridge Maintenance

September 23, 2021 - September 24, 2021

Crews will be cleaning expansion joints and drains on the Lewis and Clark bridge and the Kentucky Approach bridge on September 23rd, from 11:00 am to 3:00 pm. Work will be performed from the shoulders of the bridge on both sides of the road and in both directions. Motorists are reminded to slow down and move over in work zones, for your safety and the safety of the workers.




September 24, 2021, Shoulder Sweeping

September 24, 2021 - September 25, 2021

On September 24th, crews will be sweeping the roadway from Mile Marker 8.78 on SR 265 to Mile Marker 37.8 on KY 841 between 11:00 am and 3:00 pm. Work will take place on both sides of the road and in both directions. Motorists are reminded to slow down and move over for maintenance vehicles, for your safety and the safety of the workers.




September 24, 2021, Accident Repair

September 24, 2021 - September 25, 2021

On Friday the 24th crews will be closing the shoulder of KY 841 near Mile Marker 38.9 to conduct repairs to the barrier wall that was damaged in a vehicle accident. Work will be conducted between 11:00 am and 3:00 pm. Please give the workers and their equipment plenty of room for safety.




September 25, 2021, Bridge Sweeping

September 25, 2021 - September 26, 2021

Bridge sweeping operations will begin at 8:00 am on Saturday the 25th of September and conclude by 5:00 pm. Bridge sweeping will be a moving operation on both sides of the road in both directions to remove dirt and debris. All work will be performed between Mile Marker 8.78 on SR 265 and Mile Marker 37.8 on KY 841. Motorists are reminded to give workers and equipment plenty of room for safety and to slow down for maintenance vehicles and flashing lights.




September 27-29, 2021, Accident Repairs

September 27, 2021 - September 29, 2021

From Monday the 27th through Wednesday the 29th,  crews will be closing the shoulder of KY 841 near Mile Marker 38.9 to conduct repairs to the barrier wall that was damaged in a vehicle accident. Work will be conducted between 11:00 am and 3:00 pm each day. Please give the workers and their equipment plenty of room for safety.




September 18-30 2021, Bridge Painting continues

September 18, 2021 - September 30, 2021

Crews will continue to do touch up painting on the Lewis and Clark Bridge. Painting of the cable anchors on the shared use path side of the bridge should be completed by Tuesday the 21st. Anchors on the upstream side of the bridge should be completed by the 30th.




April to November, 2021, Vegetation Management

April 6, 2021 - November 1, 2021

Seasonal vegetation management will take place on the East End Crossing from April to November. Crews will be out mowing, weed eating, seeding, tree trimming and treating weeds. Motorists can expect crews on the shoulders of the road, in close proximity to moving traffic and in the island areas of the roundabouts on SR 62. Please use caution and give our workers plenty of room for safety.