Crews on the East End Crossing will be closing lanes between Mile Marker 8.78 and 12.7 on SR 265 on the April 26th, 27th and 28th, between 11:00 am and 3:00 pm each day. Motorists can expect single lane closures on both the right and left lanes in each direction while crews perform cleaning, inspections and minor maintenance on the 13 bridges on the Indiana side of the East End Crossing. For your safety and the safety or our crew members, please slow down and move over for work zones.