March 3rd, Motorists can expect a left lane closure on SR 265 between 11:00 AM and 3:00 PM for surveying operations. Work will be performed at the bridge between mile markers 10.8 and 10.6 in the westbound direction. Please slow down and move over for maintenance vehicles and work zones.