Crews will be performing bridge washing activities on the Lewis and Clark bridge on 4/24 through 4/25. The shared use path will be closed at the Lewis and Clark Bridge from 7am to 7pm on Monday 4/24 and Tuesday 4/25. Please pay attention for maintenance vehicles along the shared use path and be respectful of the barricades erected at the bridge. For your safety, do not remove the barricades or proceed along the path past the barricades.