Crews will be performing night time bridge washing activities on all the bridges on the East End Crossing beginning a at 7:00 pm on Sunday April 18th and continuing nightly until Friday April 23rd at 6:00 am. Work will be performed from Mile Marker 8.78 on SR 265 to Mile Marker 37.8 on KY 841. This work will require working on both sides of the road in both directions during this week long maintenance operation, this will be a moving operation affecting only one location and direction at a time. Please slow down and move over for maintenance vehicles and give everyone room to work safely.