Crews will be performing bridge work on the nights of April 19th and 20th between 7:00 pm and 6:00 am with lane closures affecting SR 62 in the roundabouts. Work will involve both directions of travel on SR 62 and both sides of the road, one lane at a time while maintenance is performed on the bridges crossing SR 62. Closures will be short duration closures but may be repeated over the two night period. Please slow down and move over for work zones.