Crews will be cleaning expansion joints and drains on the Lewis and Clark bridge and the Kentucky Approach bridge from 11:00 am to 3:00 pm. Work will be performed from the shoulders of the bridge on both sides of the road and in both directions. Motorists are reminded to slow down and move over in work zones, for your safety and the safety of the workers.