Crews at the East End Crossing will be performing bridge maintenance on SR 265 in the eastbound direction on the 15th, 16th and 17th. Work will take place between mile markers 11.1 and 11.2 and is set to begin at approximately 7:00 PM Friday and Saturday night. Motorists can expect a single lane closure each night with the left lane closed on Friday and the right lane on Saturday; all work, including traffic control devices, will be cleared from the roadway by 6:00 AM Monday morning. For your safety and the safety or our crew members, please slow down and move over for work zones.